New Fit Out to 3 floors to adjoining Head Office building in McMahons Point consolidating 3 other existing locations into 1 location for their production teams. This was our second project for Endemol Shine.
We worked with the builder on an ECI process due to very tight budget and time frame. Considerable value engineering was completed as a team with all stakeholders to ensure budget available was spent to generate maximum revenue whilst maintaining a creative amenity. This project was a great example of the power of a collaborative team and involved client.
The office where Snowy Hydro were based in Sydney was an iconic location on a wharf in the shadow of the harbour bridge. However, the space was tired and awkward. It was simply not performing as required. Spitfire Control was appointed to change things.
The office where Snowy Hydro were based in Sydney was an iconic location on a wharf in the shadow of the harbour bridge. However, the space was tired and awkward. It was simply not performing as required. Spitfire Control was appointed to change things.
Makinson d’Apice had been in their existing office space for many years and the configuration was starting to impact upon their business. They needed to move to new premises that could allow them to grow, and better more effective, but not at an increase to their bottom line.
Makinson d’Apice had been in their existing office space for many years and the configuration was starting to impact upon their business. They needed to move to new premises that could allow them to grow, and better more effective, but not at an increase to their bottom line.